The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed.
Install vinyl trim around chimney.
Learn how to curve j channel vinyl siding around a chimney.
The best solution is to contact a certified chimney sweep to inspect your chimney and determine the root cause of the problem.
Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips.
If it s between 60 and 80 degrees leave a 1 16 in.
Gap for every 18 ft.
Below 60 degrees leave a 1 8 in.
Find out how an overlapping technique with your building wrap will make the area around your chimney waterproof when installing j channel siding around your chimney.
Trim boards that sit on top the siding.
After installation cover the gap with acrylic or urethane caulk.
Siding on the chimney should never be hot to the touch when your fireplace is in use.
Install the corner posts.
The total cost for materials would be between 1660 and 2490.
How to transition from brick to siding.
If you re installing trim in temps higher than 80 degrees f cut pieces to fit tightly.
On most new homes the trim goes up after the siding is installed which creates a large gap that should not be caulked.
Chimneys are designed to withstand high temperatures and protect the structure of your home including the siding from damage.
Labor is an additional charge and to install 830 feet of linear trim the project would take approximately 2 to 4 days 16 to 48 labor hours.
Typical brick applications include fireplace boxes and chimneys and several courses.