All three of these methods will result in a professional quality.
Install shower base on tile floor.
Normally the prefabricated base is embedded in a thin layer of mortar for stability but unlike custom tile shower pans leaking almost never happens with prefabricated shower pans.
Required tools for this shower tile project.
You will need a wet saw with a fresh diamond blade.
The shower floors are tiled with 2 x 2 tiles image 1.
Screw the shower pan rim into the wall studs using 1 1 4 inch screws through the pre drilled holes.
For extra waterproofing install a shower pan liner between layers of mortar before laying the shower pan on top.
Remove the base and then cut the tile.
Apply thinset on the floor slide tiles into place and pat them down with the rubber grout float.
Lastly remove the 1 2 ledgers and add the bottom row of tiles.
The base needs to have a drain an edged frame and tiles for the decorative finish.
Also keep that shower tile looking fresh in the future by regrouting wall tile.
Acrylic or fiberglass shower pans have some flexibility and will not crack if there is a small amount of flex to the subfloor.
Place cardboard or another material into the shower pan base to protect its surface.
3 popular choices for a custom shower pan.
Setting the floor tiles is the same as the walls.
If your next bathroom remodel includes a tub or prefab fiberglass shower base then the installation is going to be pretty straightforward.
But if you re thinking of installing a tile shower floor you ve got some decisions to make when it comes to your method of installation.
Place tile spacers flat side down along the shower base where it meets the shower base flange.
The primary goal of the shower base is to create a sloped floor angled toward the drain so the waste water flows efficiently into the pipes.
My suggestion to you is to tile the bathroom everywhere except against the shower base.
Get a professional plumber to rough in the shower drain before starting the concrete installation.
Temporarily place tiles along the wall sitting on top of the tile spacers.
Then return hand place the tiles in position with spacers temporary lay the base in place over the loose tile and scribe a line that follows the front of the base.