Solid parquet hardwood flooring can be glued directly to a concrete slab on grade or above grade with the use of a manufacturer recommended vapor retarder.
Install engineered hardwood over concrete with underlayment.
We should note too that if your basement is prone to flooding laminate is on the list of poor flooring choices that includes carpeting solid hardwood and engineered hardwood and we don t recommend that you attempt to install it over concrete.
Your very first step before installing engineered hardwood floors over concrete is to let the boards acclimate to the room where they re going to be installed.
Next check the boards for warpage or defects and then remove any bad ones.
How to install engineered wood over concrete engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Considering new hardwood floors.
And then use a hand stapler to attach to the subfloor.
You don t want the adhesive drying before you can get to that area.
Only spread the adhesive over small areas ahead of you at any given time.
Watch as jack explains what s involved in floating installation of engineered hardwood flooring.
When you float an engineered or laminate floor none of the boards are actually attached to the subfloor.
Underlayments pads are especially important for engineered floors or laminate floors which are installed via the floating method over wood or concrete subfloors.
Follow these steps to install an engineered wood floor in your home.
For excellent flooring choices for moist wet areas see waterproof basement flooring best options.
Treated plywood to the concrete with concrete screws spaced every 16 in.
With a nail down engineered hardwood floor follow the same subfloor preparation steps as above including underlayment and laying spacers around the room s perimeter to maintain the manufacturer s recommended expansion gap.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
Solid parquet should not be installed below grade.
You ll learn what tools you.